on one side has exceeded 8000h, which meets the life
- Categories:Qualification honor
- Author:
- Origin:
- Time of issue:2020-06-18 21:41
- Views:
(Summary description)Power Plant is in the range of (10-7) mm / 1000h, that is to say, the service life of roller sleeve on one side has exceeded 8000h, which meets the life requirements of power plant for mill. The service life of 10 zgm95g medium speed grinding rolls in Daba Power Plant Phase II has reached 20000 hours. In recent years, our company has done a lot of work in the research of process stability of
on one side has exceeded 8000h, which meets the life
(Summary description)Power Plant is in the range of (10-7) mm / 1000h, that is to say, the service life of roller sleeve on one side has exceeded 8000h, which meets the life requirements of power plant for mill. The service life of 10 zgm95g medium speed grinding rolls in Daba Power Plant Phase II has reached 20000 hours. In recent years, our company has done a lot of work in the research of process stability of
- Categories:Qualification honor
- Author:
- Origin:
- Time of issue:2020-06-18 21:41
- Views:
Recommended
BEIJING POWER EQUIPMENT GROUP CO., LTD
Add:No.12 Haotian street, Liangxiang, Fangshan, Beijing (102401) Tel:010-69372305,69372323,69372429 Fax:010-69352288
Copyright: Beijing Power Equipment Group Co., Ltd 京ICP备09084661号-2 京公网安备11011102000951 Powered by www.300.cn