
- The Director and His Delegation Of Petrobras (The Brazilian National Petroleum Corporation) Came To BPEG For Research 2023-08-31
- The Chilean Ambassador and Counselor to China, As Well As a Delegation Led By CPECC Intl, Visite And Exchange Ideas At BPEG 2023-07-12
- BPEG Hydrogen Energy Division won the bid for Tongliao Thermal Power Hydrogen Generation Power Plant Project 2023-06-30
- BPEG Technical Proposal Of 300MW Non Supplementary Combustion Compressed Air Energy Storage Turbine Expander Successfully Passed The Review Meeting 2023-06-30
- BPEG Busbar Product Operate in "Hualong No.1" Nuclear Power Project 2023-04-14
- BPEG 500kV/6000A large capacity series current limiting reactor has passed the new product (technology) appraisal of China Machinery Industry Federation 2023-04-04
- BPEG Product Model Appears at the 2023 International Industrial Cooperation Conference (Singapore) 2023-04-04
- BPEG Held The Ceremony Of The Joint Research Center For New Energy And Key DC Equipment With Tsinghua University (Department of Electrical Machinery) 2023-03-16
- BPEG Won The Bid of Electric Feed Pump Project 2023-03-16
- BPEG Won The Vertical Mill Project Of India SHYAM Steel Group Again 2023-03-16
- BPEG Won 15 sets 200T/H Output BRM Vertical Mill Contracts 2023-03-16
- BPEG Won Insolated Phase Busduct Project From State Grid Corcoration of China 2023-03-16
- BPEG Successively Won Small Steam Turbine Projects 2023-03-16
- BEPG Launched Ceremony Of Large Alkaline Electrolytic Water Hydrogen Production Test Platform 2023-03-16
- BPEG Won The Bid Again Of The Blast Furnace Project For India SHYAM Group By Supplying Coal Mill 2023-03-16
- BPEG Won The EPC Project of 600000 Tons Of Synthetic Ammonia And Supporting Devices 2023-03-16
- BPEG Signed The Spare Parts Contract For PGCIL ± 800kV HVDC CK Phase I Project In India 2023-03-16
- BPEG won the bid for blast furnace pulverized coal preparation project in India 2022-07-14
- BPEG signed pulverizing equipment contract with Pakistan Flying Cement Company 2022-04-14
- BPEG signed coal mill contract with India Rashmi Group 2022-04-14
- BPEG Rooftop Distributed Photovoltaic Power Generation Project Successfully Connected Into Grid 2022-03-29
- BPEG Won China Electric Power Science and Technology Award for the DC Circuit Breaker Project 2022-03-28
- Nanshan Aluminium’s Indonesia Project (Phase I) Lignite drying system put into operation 2022-03-11
- Reply on filing of emergency plan for environmental emergencies 2020-08-22
- Publicity information of compulsory cleaner production enterprises 2020-08-22
- Electrical Apparatus Ltd are most welcome to factory and discuss business with us 2020-08-22
- Relocation Notice of Overseas Business 2020-08-22
- Sign cooperative agreement with HITECH 2020-08-22
- customers' urgent needs and meeting customers' needs", adhering to the development direction 2020-06-18
- research and development base, is one of the backbone enterprises of UHV power 2020-06-18
- power bus localization research and development; it is a Beijing high-tech ent 2020-06-18
- protection", and taking the auxiliary equipment of large-scale power station 2020-06-18
- been committed to building an energy equipment company integrating design 2020-06-18
- parts and maintenance services As the main business, we have formed a product pattern of po 2020-06-18
- The company has always been committed 2020-06-18
- liner and roller sleeve have been provided for Xin 2020-06-18
- five continents of the world. The company has provincial and municip 2020-06-18
- on one side has exceeded 8000h, which meets the life 2020-06-18
- domestic manufacturing advantages and out 2020-06-18
- five continents of the world. The company has provincial and 2020-06-18
- results have been achieved. The wear of Daba Power 2020-06-18
- manufacturing advantages and outstanding market share, 2020-06-18
- In 1989, our company set up a project to tackle the key problems of wear-resistant materia 2020-06-18
- The formation of power generation, power grid, metallurgy 01 2020-06-18
- BPEG has successfully passed the acceptance of the on-line monitoring system for the EHV dry type air core reactor 2018-01-08
- BPEG winning the bid of enclosed bus of the largest single capacity in hydropower plants 2017-09-12
- BPEG has Won Jiangsu 500 kV Suzhou Shipai Variable Loading Current Limiting Reactor Project 2017-08-16
- BPEG's 100 HZ blocking filtering reactor for ±800 kV UHVDC transmission passed new technology certification 2017-06-27
- BPEG's 20 KV 26-kiloampere isolated phase enclosed bus has passed product certification successfully 2017-05-26
- BPEG coal mill won overseas megawatt power plant project for the first time 2016-10-31
INFORMATION CENTER

PUBLICITY VIDEO

PUBLICITY VIDEO

PRODUCT INTRODUCTION


Mechanical products
Beijing Power Equipment Group Co., Ltd., a professional roller mill manufacturer, has always been paying close attention to new technologies for energy conservation and emission reduction worldwide.

Electrical products
Beijing Power Equipment Group Co., Ltd. has electrical equipment such as DC circuit breaker, bridge arm reactor, smoothing reactor, filter reactor, electromagnetic device, etc

Productive services
The company has provincial and municipal technology centers, is the coal mill research and development base, is one of the backbone enterprises of UHV power grid equipment and nuclear power bus localization research and development; it is a Beijing high-tech enterprise, China's top 100 machinery industry enterprises, and China's leading industrial enterprise.

Other products
Beijing Power Equipment Group Co., Ltd. has high voltage chain static var generator (SVG), industrial automation system, integrated energy management system, flame retardant and explosion-proof battery system and other products

EPC general contracting
Beijing Power Equipment Group Co., Ltd. has always been committed to the development and marketing of complete sets of pulverizing system technology. The company takes advanced grinding, separation, drying and other milling technologies as the core, takes engineering design as the leader, combines the advantages of experimental research, engineering design, project implementation, main equipment manufacturing and professional installation and debugging team to provide users with high-quality services from design, manufacturing, installation to commissioning, training, spare parts, etc

More information
Founded in 1952, Beijing Power Equipment Group Co., Ltd. is a repair and manufacturing enterprise of the original power system. Now it is subordinate to China Energy Engineering Co., Ltd. The company is located in Liangxiang of Beijing, Hebei and Xinjiang.
BEIJING POWER EQUIPMENT GROUP CO., LTD
Add:No.12 Haotian street, Liangxiang, Fangshan, Beijing (102401) Tel:010-69372305,69372323,69372429 Fax:010-69352288
Copyright: Beijing Power Equipment Group Co., Ltd 京ICP备09084661号-2 京公网安备11011102000951 Powered by www.300.cn